• Home
  • bidwrerf
  • Repair drainage network production lane was closed

Repair drainage network production lane was closed

November 29th, some people reflect the production of vehicles can not pass lane, driving home is very inconvenient. Reporters rushed to the scene learned that this section of the road is not because of the drainage pipe network due to the aging of the damaged, resulting in the surrounding area of drainage blocked, in order to speed up the progress of the rescue of the road construction was closed. In the afternoon, when reporters rushed to the scene, the drainage company repair personnel are on the road excavation. It is understood that the evening of November 26th, the production of real estate residential property jinzuo Xiang found that the drainage system within the district there is a problem, not only do not drain but to overflow, the basement is stinking sewage. They want to drain blocked dredge linked to the drainage company, water company staff to the scene, after repeated dredging did not succeed, at the end of the drainage of underground pipe network in the investigation, found that due to the drainage network is broken, leading to poor drainage. According to the on-site repair personnel, maintenance of drainage pipelines must be carried out on the road excavation, but the road is not the original production lane wide, the other side of a parked car, the construction team can not be carried out, in order to avoid the road collapsed, causing unnecessary damage to vehicles and pedestrians, construction personnel while outwardly pumping water, to ease the pressure of drainage near the side of the scene of the enclosure. Until November 29th, the traffic police department will clean up the scene after the vehicle, the construction team began to repair work. It is reported that the main reason for the destruction of the road drainage pipe network due to aging, the need to repair the drainage network is about 300 meters. Drainage company staff said the repair process in the section of the road traffic will be affected, repair teams will work overtime, as soon as possible to restore the normal passage of the road vehicles.  

admin

Leave a Reply

Your email address will not be published. Required fields are marked *